Monami have Successfully Completed the Refurbishment of EPIC Ireland/CHQ Builiding, Dublin 2

Monami have Successfully Completed the Refurbishment of EPIC Ireland/CHQ Builiding, Dublin 2

Monami Construction have successfully completed the Refurbishment of the EPIC Ireland/CHQ Building, Dublin 2. The main work consisted of the following:

    • Facilitation works in an existing occupied building and protected structure for the Epic Ireland visitor attraction at basement vault level
    • Remodelling of the existing ground floor toilet block
    • Provision of new western central entrance and alterations to the existing southern and south western entrances
    • New M&E Installations
    • Repointing of the existing stonework
    • Development of the existing mezzanine level to accommodate a public bar / restaurant and all associated alterations
    • Access, egress and internal circulation connecting these new elements with the existing building.

The project was completed to a very high standard, on time and within budget.

2016-04-22 13.28.17     2016-04-22 13.34.31

2016-04-22 13.32.26
Scroll to Top