Monami Construction have been appointed to complete the new UL Student Centre contract.
This landmark building consists of a 3,529 square metre building set four storeys over basement boasting a landscaped roof garden on the first floor and new performance and event spaces, including a 230-seat capacity auditorium with retractable seating. The centre is located in a prime front location adjacent to the Stables Complex and the Glucksman Library.
The €34m project is due to be completed in 14 months.