Clayton Hotel, Cardiff Lane

Clayton Hotel, Cardiff Lane, Dublin

The development will consist of:

(1) Demolition of No’s 3-5 Cardiff Lane;

(2) The construction of an extension to the north of the existing hotel of 10 storeys to include the following:

(a) 115no. new bedrooms in total consisting of 8no. bedrooms at Upper Ground Floor Level, 13no. bedrooms at each of Levels 1-7, and 18no. bedrooms at Level 8 (5no. of these bedrooms which are over the existing hotel).

(b) Ground floor cafe / retail unit with associated signage.

(c) Ground floor covered redirected escape route.

(d) Ground floor back-of house service area for the hotel with associated delivery access and loading bays.

(e) Furniture Store for adjacent Conference Centre at Upper Ground Floor Level.

(3) Office at Level 1 on the flat roof of the existing hotel restaurant.

(4) Extension to the Level 8 plant room.

(5) All associated site works

Detail

Client:
Dalata Hotel Group

Location:
Cardiff Lane, Dublin.

Value:
€21,000,000

Duration:
24 Months

Architect:
Douglas Wallace

Project Manager:

MGM Partnership

QS:
Tom McNamara & Partners

M&E Engineer:
Patrick McCaul’s Consulting Engineers

Civil & Structural:
Barrett Mahoney Consulting Engineers

Fire Safety Consultants:
Gillick Fire Safety

Projects: